Complete line for deslamming and melting cans UBC

Do you need to convert used cans in marketable ingots, but you are worried about aluminum losses, gas consumption and emissions? Our complete recycling line from UBC cans to ingots connects crushing, separation, thermal peeling, fusion, refining and casting.
At Yushunxin we design each stage according to the quality of your UBC, required production and ingot specification. So, can evaluate a complete installation with metal recovery indicators, energy and salable product.

♻

Aluminum recovery

Transform used cans into a reusable raw material.

🔥

Higher material purity

Removal of paint and coatings improves preparation before casting.

🔄

Circular economy

Reduces waste generation and promotes the sustainable recycling of aluminum.

🔥

heating options

gas natural, liquid fuel or electricity, according to project conditions. Can also be configured with internal or external heating.

Which companies need a complete UBC line?

An aluminum recycling plant must justify its investment through tons of marketable product. That's why, the decision does not depend solely on the deslacking oven. The quality of the material received also influences, the existing equipment and the aluminum sales contract.

New UBC ingot recycling plant

A new facility needs to organize reception, preparation, heat treatment and liquid aluminum production. Besides, must coordinate the casting with the fusion rhythm.
Our complete line of deslamming and fusion of UBC cans allows us to study these stages under the same engineering scope..

Expansion of an existing foundry

If you already have a melting furnace, we can evaluate your diet, capacity and thermal connections.
However, Adding UBC pretreatment and stripping to an existing furnace requires checking the gases and control system. This way we avoid incorporating equipment that is incompatible with the current operation..

How does UBC quality influence setup and performance??

Two bales of the same weight can contain different amounts of recoverable aluminum. Besides, humidity, plastic and ferrous materials increase separation loads. Therefore, the receiving specification must be established before sizing the thermal equipment.

used aluminum cans

Metal content of UBC bales

We work with used aluminum cans for drinks (UBC), loose or compacted.
During sampling we check metallic content, humidity, density and foreign materials. We also record residual liquids and variations between suppliers.
For example, 3 tons of UBC with a 94 % of metallic content theoretically contain 2,82 tons of aluminum. The remainder should not be included in the calculation of recoverable metal.

Plastic labels and chlorine contaminants

Retractable sleeves, labels and other plastic waste can modify the composition of gases.
If there are materials with chlorine, the treatment of acid gases should also be evaluated. For this reason, pre-classification protects both the thermal process and the environmental system.

Used aluminum cans

Complete UBC recycling process

The continuous rotary stripping kiln works in a closed, oxygen-poor atmosphere.. The reference temperature is between 400 y 600 °C. Meanwhile, aluminum remains below its approximate melting point of 660 °C. The paintings, inks and films organics decompose during pyrolysis. Temperature control, oxygen and system pressure helps limit oxidation. technique presents a deslagging rate higher than 99 % as a reference for certain configurations.

The process includes the trituration, Secondary crushing,the separation and cleaning, he thermal peeling, he drum screening, the aluminum melting y, finally, gas treatment and purification.

See how our UBC can recycling line works

See how UBC can paint removal process before casting works. At this stage, used aluminum cans go through a paint removal oven to remove coatings, paints and other organic surface components. This pretreatment facilitates the preparation of aluminum for the subsequent stages of casting and ingot production.. The video shows the real operation of a continuous paint removal line from UBC cans and its integration into the aluminum recycling process.

How to obtain greater metal recovery during UBC smelting?

Aluminum flakes are light and can float on the molten pool. If they remain exposed to air, increases the risk of oxidation. For this reason, the configuration of the melting furnace must facilitate its immersion and limit the formation of slag.

Recovery by fusion

Side Well Melting Furnace

The deglazed aluminum is introduced into a melting furnace with a side well. Submerged feeding and bath circulation facilitate the incorporation of the flakes into the liquid metal. Besides, Help reduce aluminum exposure to air and oxidation losses.

The treatment capacity of the melting furnace is sized according to the production of the descaling furnace, guaranteeing adequate correspondence between both stages, with casting temperatures of 730–760 °C. The energy source can be natural gas or electricity, according to production needs and plant conditions.

Fusion time also varies depending on the system selected. As a preliminary reference, natural gas furnace requires approximately 8–10 hours per cycle, while the electric option can complete the process in around 2 hours. These times must be confirmed depending on the model, the installed power and load of each lot.

The stripping oven can be configured with internal or external heating. Natural gas is generally used, although liquid fuel or electricity can also be selected.

How does the integrated system reduce natural gas consumption?

Stripping and smelting require large amounts of thermal energy. If they work as independent systems, part of the heat is lost. That's why, Our solution takes advantage of the hot gases from the melting furnace and recovers fuel from the pyrolysis process.

Melting Furnace Heat Recovery

Melting Furnace Heat Recovery

The hot combustion gases from the aluminum furnace are led to the descaling system.
There they provide part of the heat necessary for pyrolysis.. Besides, This connection can reduce the external fuel demand during stable operation.
The thermal circuit must be designed according to the flow, the temperature and real needs of both ovens.

Reuse of fuel gases

The stripping process generates combustible gases that can be used for energy.
First, These gases pass through a cyclone that removes the entrained particles. After, return to the combustion system of the melting furnace.
our integrated solution contemplates an overall natural gas consumption of approximately 60–65 Nm³ per ton of finished aluminum.

Reuse of fuel gases

Why producing ingots can generate more

value to sell deglazed aluminum?

Crushed or deglazed aluminum still requires additional operations before becoming a marketable cast product.. Instead, ingots allow delivering an alloy with composition, defined weight and identification. That additional processing can increase the commercial value of the recovered material.

Refining and composition control

After the merger, liquid aluminum may require degassing, alloy filtration and adjustment.
Spectrometric analysis allows checking the chemical composition. Besides, Control of inclusions and gases helps evaluate metal quality.
For demanding applications, we can also study rotary degassing and ceramic filtration.
However, not all aluminum obtained from UBC can be directly converted into material to make new cans. The composition must meet the buyer's specifications.

Automatic casting and traceability

The conditioned aluminum goes to an automatic aluminum ingot casting line.
The installation can integrate dosing, fill, cooling, demolding, marking and stacking. Besides, each batch retains composition and production information.
Bullion allows you to market a product with verifiable characteristics. For this reason, can access buyers who demand more defined specifications than those of scrap.

How many ingots can a UBC line actually produce? 3 t/h?

Nominal capacity represents input material, not finished ingots. Besides, each operation generates different losses or rejections. That's why, an industrial quote must include a mass balance from the UBC received to the conforming aluminum that can be sold.

Indicators to evaluate the investment:

Indicator What can be checked
UBC–Bullion Yield Amount of final product per ton of input
Global metal recovery Losses with respect to the aluminum contained
Specific gas consumption Energy cost per ton of product
Conformal ingot production Really marketable volume
Slag and fines Losses and management costs
Operational availability Actual production hours

The actual balance must include rejections, thin, carbonaceous residues, slag and smelting losses. Besides, must record the energy consumption per ton of ingot in accordance.

3 t/h

UBC Entry

94 %

Metal content

2.82 t/h

Recoverable aluminum

Separation → Desilting → Merger → Refining

2.60 t/h

aluminum ingots

Global metal recovery ≈92.2 %

UBC-bullion yield ≈86.6 %

What emissions data should you check before installing the line?

The painting, plastic films and other contaminants generate gases during heat treatment. Besides, Its composition may change between providers. That's why, The environmental system must be designed according to the pollutant load and the limits required at the installation site..

Gas treatment through double regenerative system

Our configuration integrates centralized collection of process gases.
First, the gases pass through a regenerative chamber of the melting furnace, where its temperature increases. After, enter the combustion chamber to oxidize organic compounds.
Next, pass through another regenerative chamber and cool rapidly. Dual regeneration system uses a four-way diverter valve to alternate combustion and evacuation.
Finally, an induced draft fan drives the gases to the pulse dust removal system. They then undergo acid washing by spraying before discharge.

Gas treatment through double regenerative system

Environmental reference values ​​for secondary aluminum:

The BAT conclusions of the European Union, Decision 2016/1032, include the following levels associated with certain secondary aluminum operations:

Service Engineering requirement
Gas natural Flow rate and pressure for expected conditions
Electricity Installed power and operational demand
cooling water Caudal, temperature and quality
Compressed air Equipment pressure and consumption
Nitrogen Availability depending on the refining process
PLC/SCADA Coordination of equipment and registration of parameters
Environmental treatment Gas flow, filtration and washing

What ancillary services does a complete UBC line need??

An installation can stop even if all its main equipment is correctly sized. For example, Insufficient gas supply limits casting, while an inadequate extraction system affects the stripping. That's why, auxiliary services are part of the project.

Main services and interfaces

Service Engineering requirement
Gas natural Flow rate and pressure for expected conditions
Electricity Installed power and operational demand
cooling water Caudal, temperature and quality
Compressed air Equipment pressure and consumption
Nitrogen Availability depending on the refining process
PLC/SCADA Coordination of equipment and registration of parameters
Environmental treatment Gas flow, filtration and washing

Scope of supply and project services

Our scope covers from initial engineering to commissioning, ensuring

integration complete system of continuous thermal stripping line

Project engineering

Process design, layout and initial configuration.

Manufacturing

Equipment production and custom manufacturing.

FAT

Acceptance testing before shipping.

Automation

PLC/SCADA system and integrated control.

Technical training

Training for operation and maintenance.

Start-up

Installation, adjustment and technical support.

Benefits of converting UBC to bullion

The transformation of used aluminum cans (UBC) in ingots allows the recovery of a high-quality material

value and adapt to current trends in circular economy and sustainable waste management.

⚙️

Improved operational efficiency

The conversion of UBC into ingots allows different stages of aluminum recycling to be integrated into an organized process, facilitating a more efficient and stable operation.

💰

Greater value of recovered material

Recycled aluminum ingots are easier to store, transportation and marketing of unprocessed metal waste.

📈

Flexible industrial application

The recycled aluminum obtained can be used as raw material for different industrial applications, according to production and market needs.

What aluminum stripping capacity does your plant need??

Compare our aluminum stripping solutions 1 y 10 t/h, designed for different scrap volumes and production needs. Evaluate equipment configurations, feeding, thermal control, gas treatment and integration with the foundry to find a solution suitable for your plant conditions.

Request an evaluation of your complete UBC line

Tell us the type of bales, tons available, the target ingot and existing equipment.
With this information, We can prepare a technical proposal for the complete recycling line from UBC cans to ingots., including configuration, interfaces and performance criteria.