Does your plant need to process 10 tons of aluminum scrap per hour, but the loss of metal, energy consumption and emissions reduce your profitability?
A project for an aluminum stripping plant 10 t/h requires coordinating heat treatment, aluminum recovery, raw material supply and foundry.
At Yushunxin we evaluate the composition of scrap, planned production and existing facilities. Our goal is to reduce avoidable losses, make better use of energy and prepare aluminum for subsequent recycling.
What materials can a aluminum stripping line process? 10 t/h?
The configuration must be adapted to the characteristics of the raw material.
What problems should an aluminum stripping plant solve? 10 t/h?
On a large scale, Operational problems directly affect the total cost of the project. The painting, the lacquers,
inks and oils can generate gases and waste during casting.
The main risks are:
That's why, Increasing only the nominal capacity of the furnace does not guarantee profitable production. The project must coordinate all stages.
How to reduce the energy consumption of an aluminum stripping plant 10 t/h?
Energy consumption is one of the main recurring costs. Therefore, must evaluate both thermal efficiency and energy recovery possibilities.
Heat recovery and reuse of fuel gases
In a compatible integrated configuration, the waste heat from the melting furnace can supply energy to the carbonization furnace. In addition, Combustible gases generated during thermal decomposition can be treated and used as auxiliary fuel, according to the design.
Conventional configuration
Sistema integrado Yushunxin
| Configuration | Natural gas consumption |
|---|---|
| Independent conventional system | Approximately 100 Nm³/t |
| Integrated system with energy recovery | Approximately 65 Nm³/t |
| Estimated reduction | Approximately 35 % |
How to integrate aluminum stripping 10 t/h with foundry?
For an aluminum stripping plant 10 t/h, the melting furnace capacity should be set according to the actual production of treated aluminum. It is not enough to compare the hourly capacities of both teams.
First, We must calculate the amount of deglazed aluminum that the line produces during the planned operating period. After, We select the capacity of the melting furnace according to the volume of available material and the cycle of each batch.
How does the type of melting furnace influence the configuration?
En Yushunxin, We evaluate the production of the desizing line and the melting cycle to determine the necessary capacity of the oven. This way, we can coordinate both processes, reduce accumulations of treated aluminum and avoid unnecessary investments in melting equipment.
What environmental system does a aluminum stripping plant need? 10 t/h?
He gas treatment must be sized together with the main line. Configuration may include closed pickup, secondary combustion, dust removal, additional filtration and treatment according to gases and local regulations.
The documented integrated solution includes thermal treatment of gases, rapid cooling, filtration and purification. It also has a NOx reference value lower than 100 mg/Nm³ for a specific configuration.
This value is not a substitute for emissions testing nor does it guarantee automatic compliance in all countries. For projects in Mexico, Chile, Colombia, Argentina, Peru or Spain, environmental requirements applicable to the specific location must be verified
What information is needed to prepare a project
aluminum stripping 10 t/h?
To prepare a technical proposal, we need to know:
With this data, we can study the number of modules, fusion ability,
intermediate storage, heat recovery and equipment configuration.